TABLE OF CONTENTS
7. ENVIRONMENTAL
COMPLAINT AND NON-COMPLIANCE
8. IMPLEMENTATION
STATUS OF ENVIRONMENTAL MITIGATION MEASURES
FIGURES
Figure 1 Project General Layout
Figure 2 Air
and Noise Monitoring Locations
LIST OF APPENDICES
Appendix
A |
|
Appendix
B |
|
Appendix
C |
|
Appendix
D |
|
Appendix
E |
|
Appendix
F |
|
Appendix
G |
|
Appendix H |
|
Appendix I |
|
Appendix
J |
|
Appendix K |
Weather and Meteorological Conditions
during Reporting Month |
Appendix
L |
|
Appendix M |
|
Appendix N |
|
|
|
i.
The
Civil Engineering and Development Department HKSAR has appointed MateriaLab
Consultants Limited (MCL) to undertake the Environmental Team services for the
Project and implement the EM&A works.
ii.
This
Monthly EM&A report presents the environmental monitoring and audit works
for the period between 1 June 2017 and 30 June 2017. As informed by the
Contractor, major activities in the reporting month were:
Temporary utility diversion works;
Temporary diversion for CLP cable at
CH6+560;
Temporary diversion for sewage rising main;
Construction of temporary diversion road
for Shing Cheong Road (TTA Stage 2);
Setup of temporary barging point;
Drainage works (CH100 to CH240);
Excavation of drainage pipe and manhole
(M206 to M213);
Seawall Modification Works;
Construction of tunnel box structure;
D-wall construction works;
Construction of socket H-pile;
Pumping test for Zone 3;
Excavation and ELS construction; and
Installation of dewatering, observation and
recharging wells.
Breaches of the Action and Limit Levels
iii.
No Action / Limit
Level exceedance was recorded for 24-hr TSP and construction noise at KTD1a,
KTD2a and KER1b in the reporting month.
Complaint,
Notification of Summons and Successful Prosecution
iv.
No environmental
complaint, notification of summons and successful prosecution were received in
the reporting month.
Reporting
Changes
v.
There was no
reporting change in the reporting month.
Future
Key Issues
vi. The key issues to be considered in the
coming reporting month include:
Potential environmental impacts arising from
the above construction activities are mainly associated with construction dust,
construction noise, water quality, waste management and landscape and visual
impact.